Alapınar Precipication Pool

Main Work Volumes

  • Excavation: 3.698 m3
  • Back Filling: 1.808 m3
  • Sand-Gravel Filling: 1.440 m3
  • Concrete: 175 m3
  • Formwork: 238 m2
  • Steel Re-Bar: 19 ton
  • Pipe Diameter / Pipe Type / Length: Ø110 mm / PE100 / L: 4.000 Mt

Main Jet Base 5000 m3 Water Tank

Main Work Volumes

  • Excavation: 3.600 m3
  • Back Filling: 3.806 m3
  • Sand-Gravel Filling: 454 m3
  • Concrete: 2.083 m3
  • Formwork: 4.592 m2
  • Steel Rebar: 236,5 ton
  • Pipe Diameter / Pipe Type / Length: Ø160 mm / PVC / L: 14.000 Mt