Eskişehir Buse Park Construction
400 mt Travertine Paved Walkway, 400 mt Tartan Running Path, 500 m2 Skateboard Rink, 340 m2 Travertine Covered Outdoor Theater Area, 300 m2 Rubber Floor Covered Children Playground, 7.000 m2 Landscape Work
Main Business Volumes
- Area: 8.226 m2
- Excavation: 970 m3
- Sand-Gravel Filling: 485 m3
- Concrete: 582 m3
- Formwork: 120 m2
- Rebar: 20 tons
Eskişehir Japanese Garden and Pool Construction
750 mt Paving Stone Walkway, Composite Bridge, Special Wood and Roofing Materials Manufacturing
Main Work Volumes
- Area: 26.328 m2
- Excavation: 4.100 m3
- Sand-Gravel Filling: 980 m3
- Concrete: 512 m3
- Insulation: 1.975 m2
- Rebar: 25 ton
Anadolu University Faculty of Engineering Landscaping Works
Main Work Volumes
- Excavation: 750 m3
- Sand-Gravel Filling: 600 m3
- Concrete: 1.050 m3
- Mold: 4.500 m2
- Rebar: 116 ton
- Structural Steel: 11 ton
Eskişehir Kent Park Boundary Wall Construction
1500 mt. Length Boundary Wall Construction Using Special Steel Formwork (with Rubber Pattern) and Guard Rails
Eskişehir Kentpark Outdoor Swimming Pool Construction
5.200 m2 Sea Sand Laying, 1.700 m2 Washconcrete Cover, 300 mt Production of Grill Channel, Painting of Pool Floor with special blue paint
Main Work Volumes
- Area: 12.218 m2
- Excavation: 36.654 m3
- Sand-Gravel Filling: 6.109 m3
- Concrete: 1.917 m3
- Insulation: 7.669 m2
- Mains Pipe Diameter / Pipe Type / Length: Ø110 mm / PE100 / L: 2000 Mt
Mains Pipe Diameter / Pipe Type / Length: Ø110 mm / PE100 / L: 2000 Mt
9 mt diameter 14 mt deep Caisson Lift Station Construction
Main Work Volumes
- Excavation: 9.044 m3
- Shaped plywood: 784 m2
- Back Filling: 3.150 m3
- Sand-Gravel Filling: 3.150 m3
- Concrete: 261 m3
- Insulation: 459 m2
- Formwork: 854 m2
- Rebar: 31 ton
- Mains Pipe Diameter / Pipe Type / Length: Ø250 mm PE100 L: 6.000 Mt