Eskişehir Akarbaşı District Pressurized Irrigation Network Construction
Main Work Volumes
- Excavation: 12.700 m3
- Back Filling: 6.350 m3
- Sand-Gravel Filling: 6.350 m3
- Pipe Diameter / Pipe Type / Length: Ø250-Ø200-Ø160-Ø110 / PE100 / L: 11.340 mt
Eskişehir Alpagut Neighbourhood Field Irrigation Pipeline Construction
Main Work Volumes
- Excavation: 8.848 m3
- Back Filling: 4.424 m3
- Sand-Gravel Filling: 4.424 m3
- Pipe Diameter / Tube Type / Length: Ø315-Ø255-Ø200-Ø160-Ø110 / PE100 / L: 7.900 mt
Eskişehir Emek Neighbourhood Waste Water Pipeline Construction
342 nos. Prefabricated Manhole, Ø150 mm Corrugated Pipe 5.754 mt Parcel Connection, 822 nos. Prefabricated Parcel Chimney
Main Work Volumes
- Excavation: 34.250 m3
- Sheet Pile-Wall: 68.500 m3
- Back Filling: 22.605 m3
- Sand-Gravel Filling: 11.645 m3
- Pipe Diameter / Pipe Type / Length: Ø800-Ø600-Ø500-Ø400-Ø300-Ø200 / Concrete Pipe / L: 13.700 mt
Eskişehir Geçek Neighbourhood Waste Water Pipeline Construction
4-eyed septic tank construction. 94 nos. Prefabricated Manholes, 1.575 mt Ø150 mm Corrugated Pipe Parcel Connection, 225 nos. Prefabricated Parcel Chimneys
Main Work Volumes
- Excavation: 6.150 m3
- Back Filling: 4.200 m3
- Sand-Gravel Filling: 1.950 m3
- Concrete: 100 m3
- Mold: 394 m2
- Rebar: 13.5 ton
- Pipe Diameter / Pipe Type / Length: Ø200 / Corrugated Pipe / L: 3.750 Mt
Eskişehir Göktepe Neighbourhood Field Irrigation Pipeline Construction
Main Work Volumes
- Excavation: 12.740 m3
- Back Filling: 6.860 m3
- Sand-Gravel Filling: 6.860 m3
- Pipe Diameter / Tube Type / Length: Ø200-Ø160-Ø110 / PE100 / L: 14.000 mt
Eskişehir Gürleyik Neighbourhood Channel and Irrigation Pipeline Construction
Main Work Volumes
- Excavation: 20.124 m3
- Back Filler: 8.904 m3
- Sand-Gravel Filling: 11.220 m3
- Pipe Diameter / Pipe Type / Length: Ø560 mm / Steel Pipe / L: 5.600 mt; Ø450 mm / PE100 / L: 3.000; Ø110 mm / PE100 / L: 5.000
Eskişehir Hamidiye Neighbourhood Field Irrigation Pipeline Construction
Main Work Volumes
- Excavation: 1.890 m3
- Back Filler: 945 m3
- Sand-Gravel Filling: 945 m3
- Pipe Diameter / Pipe Type / Length: Ø125 mm / PE100 / L: 2.250 mt.
Eskişehir Odunpazarı İlçesi Yağmursuyu Hattı Altyapı İnşaatı
Main Work Volumes
- Excavation: 1.344 m3
- Back Filling: 672 m3
- Sand-Gravel Filling: 672 m3
- Pipe Diameter / Pipe Type / Length: Ø250 mm / PE100 / L: 1,200 mt
Eskişehir Sümer Neighbourhood Rain Water Treatment Works
Construction of Reinforced Concrete Stormwater Pool at 4x4x4 mt dimensions
Main Work Volumes
- Excavation: 1.875 m3
- Back Filling: 1.350 m3
- Sand-Gravel Filling: 525 m3
- Pipe Diameter / Pipe Type / Length: Ø400 mm / PE100 / L: 750 mt
Eskişehir Sümer Neighbourhood Pressurized Irrigation Pipeline Construction
Main Work Volumes
- Excavation: 2.457 m3
- Back Filling: 1.323 m3
- Sand-Gravel Filling: 945 m3
- Pipe Diameter / Pipe Type / Length: Ø110 mm / PE100 / L: 3.150 mt
Eskişehir Tatarcık Neighbourhood Pressurized Irrigation Pipeline Construction
100 m3 Reinforced Concrete Water Tank
Main Work Volumes
- Excavation: 3.450 m3
- Back Filling: 2.100 m3
- Sand-Gravel Filling: 1.650 m3
- Pipe Diameter / Pipe Type / Length: Ø90 mm / PE100 / L: 5.000 mt
Eskişehir Üçbaşlı Neighbourhood Pressurized Irrigation Network Construction
Main Work Volumes
- Excavation: 11.880 m3
- Back Filling: 6.160 m3
- Sand-Gravel Filling: 5.720 m3
- Pipe Diameter / Pipe Type / Length: Ø200 mm / PE100 / L: 11.000 mt
Eskişehir Yazır Neighborhood Waste Water Pipeline Construction
4-Eye Septic Construction
Main Work Volumes
- Excavation: 9.840 m3
- Back Filling: 6.720 m3
- Sand-Gravel Filling: 3.120 m3
- Pipe Diameter / Pipe Type / Length: Ø200 / Concrete Pipe / L: 6000 mt; 150 nos. Prefabricated Inspection Chimney, Ø150 mm Concrete Pipe 2.250 Mt Parcel Connection, 360 nos. Prefabricated Parcel Chimney