Eskişehir Porsuk 75 km. Channel Construction
4.50 mt. Base Width, 3.00 mt height, with a length of 75000 mt. Trapezoid Channel Construction
Main Work Volumes
- Area: 8.226 m2
- Excavation: 1.687.500 m3
- Sand-Gravel Filling: 243.375 m3
- Concrete: 194.700 m3
- Formwork: 120 m2
- Rebar: 20 ton
Eskişehir Tavşanlı Water Channel Construction
3.00 mt. 2.00 mt of Base Width, 7,000 mt long Trapezoidal Channel Construction
Main Work Volumes
- Excavation: 84.000 m3
- Sand-Gravel Filling: 15.750 m3
- Concrete: 12.600
Eskişehir Yassıhöyük Water Channel Construction
0.50 mt Base Width, 1.00 mt Height, 17.000 mt long Trapezoidal Channel Construction
Main Work Volumes
- Excavation: 21.250 m3
- Sand-Gravel Filling: 10.625 m3
- Concrete: 30.600 m3
Eskişehir Esentepe Neighborhood Water Channel Railings Construction
54.000 mt Special Steel Formwork
Main Work Volumes
- Excavation: 27.000 m3
- Sand-Gravel Filling: 13.500 m3
- Concrete: 13.500 m3
- Formwork: 54.000 m2
- Rebar: 1.485 tons
Eskişehir Gökmeydan Neighborhood Water Channel Railings Construction
200 mt long, 6 mt height retaining wall construction
Main Work Volumes
- Pile: 7.200 mt
- Sand-Gravel Filling: 3.600 m3
- Concrete: 1.120 m3
- Formwork: 2.400 m2
- Rebar: 123 ton
Kütahya Örenli Flood Protection Construction
10 nos. 30 mt long 5 mt height stone wall, 2 nos. 30 mt long 5 mt height reinforced concrete flood protection structure construction
Eskişehir Gürleyik Neighbourhood Water Channel Construction and Irrigation Pipe Installation Works
Main Work Volumes
- Excavation: 20.124 m3
- Back Filler: 8.904 m3
- Sand-Gravel Filling: 11.220 m3
- Concrete: 582 m3
- Formwork: 120 m2
- Rebar: 20 ton
- Mains Pipe Diameter / Pipe Type / Length: Ø560 mm Steel Pipe / L: 5.600 Mt; Ø450 mm PE100 / L: 3.000; Ø110 mm PE100 / L: 5.000